This website uses cookies to ensure you get the best experience on our website. By continuing to use this site, you agree to our cookie  & privacy policy.Accept

Scope of the call

We would want to speak with the CXOs/Operations head/Business head/Sales head of pre-engineered steel building (PEB) and pre-fabricated (Prefab) building providers. As part of the discussion agenda, we will be covering the following points: Understanding the PEB and Pre-fabricate building market in India (market size, volume, realization per ton, growth, drivers, etc.) Key end-use industries and share of market by end-use industries. Brief understanding of competition in the industry (PEB and Pre-fabricate building) Current supply scenario and planned capacity expansion by key players (in both PEB and Prefab building) Understanding of the business model (including Inhouse vs outsourced capabilities) and unit economics Brief view on the revenue outlook of the company in both PEB and Pre-fab segment Understand the procurement strategy (Vendor selection, pricing, lead time, inventory, etc.) Sourcing mix – Primary suppliers vs Secondary suppliers (Dealers, Stockist, etc.) Customer acquisition strategy – share of revenue from channels such as influencers, direct client outreach, company outreach, online enquiries etc. What is the existing base of influencers (architects, contractors), size of sales/BD team. Commission arrangement with the influencers Total cost of ownership for PEB/Prefab vs traditional construction Key success factors in the industry

A leading consulting firm

Expected date of call: 18/11/2024

Minimum experience Needed: 12 Year(s)

BROAD CATEGORY

Manufacturing/Operations

Sub CATEGORY

Manufacturing/Operations head

INDUSTRY

Construction & Engineering

Domain Expertise Needed

Pre-fabPEB

Required experience in organisation like

Everest Industries LimitedZamil Steel Buildings India Private LimitedPhenix Building Solution/M&B EngineeringKirby Building Systems & Structures India Private LimitedPennar IndustriesInterarch Building Products Limited

Have worked in roles like

-

Question You Would be expected to answer

  • Current revenue of the company and revenue split between PEB, Pre-fab and other segments
  • Realization per ton (INR) for PEB and Pre-fab
  • Which are the existing plants (location) and the installed capacity for both PEB and Pre-fab